Procedure

  • In case of self-user
    Training & Testfor obtaining self-user license
    In case of requestion
    Contact and disuss withUCRF staff

    Visit UCRF homepage for reservation

    Self-user measurement
    Fill in logbook &Check the equipment
    Staff measurement
    Review and provide theresults

    Inform the free to user at the following month

  • Reference

    • UNFC internal equipment is self-operated available as shown in the following order.
    • Needs Self user On- line reservation [http://ucrf.unist.ac.kr]
    • When request of equipment operating to UCRF staff, must have a discuss with staff.

    Guide of using UNFC

    • Applicationof safety training
    • Taking a courseof safety training
    • Evaluation and interview
    • Application of long termaccess and payments
    • Approval and issueaccess cards

    Guide of using equipment

    • On-line reservationof the equipment operatortraining
    • Taking a courseof equipment operatortraining
    • Evaluate progress(Representative)
    • On-line reservationuse of the equipment
    • Equipment approval for use
    • Check & Confirm ofequipment bill(Last day of every month)
  • 환경분석센터에서 서류검토→서류검토완료→접수증발급,접수→검사일통보→검사→성적서발급→검사결과보관,시험성적서교부,관할시청 및 유역환경청에 검사결과 통보/ 다이옥신 법정의무 시료→관할시청 및 유역환경청에 검사결과통보/수수료 입금→접수
  • client request

    • Filling out request for processing (client)
    • Accepting request for processing (CAD file, sketch, photo)
    • Discussion on progression of processing manufacturing
    • Material purchase, modeling(plans) works
    • Feedback on plans (client)
    • Selection of processing machine & checking processing conditions
    • Confirming product & measuring
    • Receipt of product (client)
    • Billing

    Self-user

    • Machine training for self-use
    • Safety education & exam
    • Material purchase, modeling(plans) works
    • Consulting technician in charge of machine
    • Visiting homepage & reserving processing schedules
    • Selection of processing machine & checking processing conditions
    • Confirming product & measuring
    • Billing
    • User Training (Group Seminar)
      User Training Application
    • Animal Ethic Training(On line)
      CITI Program Individual Sign up
    • On-Site Training
      IVRC Access Permissions Application
    • IACUC Deliberation
      Animal Experiment Protocol
    • Animal Import
      Animals Purchase Application Animals Import Application from outside facility
    • Animal Experiment
      Technical Support Application Equipment Use Application
    • Experiment Completion
      Animal Experiment Completion Report

    The form can be downloaded from the(http://ucrf.unist.ac.kr) After filling the various forms, please scan and send via e-mail

  • In case of self-user
    Training & Testfor obtaining self-user license
    In case of requestion
    Contact and disuss withUCRF staff

    Visit UCRF homepage for reservation

    Self-user measurement
    Fill in logbook &Check the equipment
    Staff measurement
    Review and provide theresults

    Inform the free to user at the following month

    • Submit registration form for radiation worker
    • Radiation education by law (new worker, periodic)
    • Medical check up
    • radiation worker registration & get a personal dosimeter
    • submit the RI purchase request, experiment method
    • order to RI sales agency, receiving
    • RI use, storage, disposal in radiation area
    • the end of radiation work & return the personal dosimeter

    Standards for permit/notify of Radioisotope, etc.

    Standards for permit/notify of Radioisotope, etc.
    standards related Law
    Permit RI
    • 1.Unsealed source and Facilities
    • 2.Sealed source and Facilities
    Art. 53 of Nuclear Safety Act. and Art. 65 & 66 of Enforcement Regulation
    RG
    • radiation generating devices, of which the maximum voltage of the accelerating tube is more than 170 kilovolts and the surface radiation dose rate is more than 10μSv/h
    Notify RI
    radioisotopes are contained in any equipment
    • 1.Usage:
      • ① X-ray fluorescence analysis;
      • ② X-ray diffractometry;
      • ③ Electron capturing regarding gas chromatography;
      • ④ Others determined and publicly notified by the commission
    • 2.Quantity:
      • ① or calibration
        • 1) the quantity of radioisotopes shall not be more than 40MBq
        • 2) the surface radiation dose rate shall be not more than 500μSv/h when radioisotopes are in use
        • 3) 1μSv/h when radioisotopes are not in use
      • ② any container or equipment other those as provided in the foregoing Item
        • 1) quantity of radioisotope shall be not more than the level determined by commission
        • 2) the surface radiation dose rate shall be not more than 10μSv/h
        • 3) such equipment shall be integral equipment that is prevented from contact with radioactive materials
    Art. 65 & 66 of Enforcement Decree
    RG
    • 1.Usage:
      • ① X-ray fluorescence analysis;
      • ② X-ray diffractometry
      • ③ Accelerated ion implanting
      • ④ Baggage screening
      • ⑤ Others determined and publicly norified by the commission
    • 2.Capacity: Self-shielded radiation generating devices, of which the maximum voltage of the accelerating tube is not more than 170 kilovolts and the surface radiation dose rate is not more than 10μSv/h
    exemption from controlled quantity and concentration shall be not more than the level determined by commission Art. 5 of Enforcement Decree and Art. 9 of Notification on Radiological Protection guide

    * contact : Min-seok Jeong (2504)

  • Annual Operation Schedule (180 days of user beamtime with 3 runs/year)

    Annual Operation Schedule (180 days of user beamtime with 3 runs/year)/caption>
    UNIST (50%) General User (50%)
    UNIST users ER beamtime Maintenance & Upgrade General users Maintenance & Upgrade
    35% (63 days) 5% (9 days) 5% (9 days) 35% (63 days) 15% (27 days)
    • UNIST beamtine : Beamtine proposal → Evaluation → Assignment → Experiments

      • Operation Schedule : Annual schedule of user beamtime operation is posted at PAL website (http://pal.postech.ac.kr)
        • 1st Run (Jan. ~ Apr.), 2nd run (May – Jun.), 3rd (Sep. – Dec.)
      • Application method : Submit the beamtime proposal to UCRF or UCRL all the year round.
      • Application deadline : 1st Run (Early Jan.), 2nd Run (Middle of Apr.), 3rd (Mid-Aug.)
      • Assignment schedule : 1st Run (Mid-Jan.), 2nd Run (Late Apr.), 3rd (Late Aug.)
      • The application and assignment of emergency beamtime proposal is all the year round.
      • Experimental
        • X-ray Absorption Spectroscopy (XAS)
        • X-ray Crystallography
        • Small-angle X-ray Scattering (SAXS)
        • Wide-angle X-ray Diffraction (WAXD)
        • Grazing-incidence X-ray Scattering (GIXS)
      • Fees : Non-proprietary (free), Proprietary (\1,500,000/day), Request for analysis (\2,000,000/day)
    • General user Beamtime : Beamtine proposal → Evaluation → Assignment → Experiments

      • Operation Schedule : Annual schedule of beamtime operation is posted at PAL website (http://pal.postech.ac.kr)
        • 1st Run (Jan. ~ Apr.), 2nd run (May – Jun.), 3rd (Sep. – Dec.)
      • Application method : Submit the beamtime proposal thorough Pohang Accelerator Laboratory website (http://pal.postech.ac.kr)
      • Application deadline : 1st Run (Aug. of Previous Year), 2nd (Dec. of Previous Year), 3rd Run (Apr.)
      • Assignment schedule : 1st Run (Jan.), 2nd Run (Mar.), 3rd (Jul.)
      • Experimental
        • X-ray Absorption Spectroscopy (XAS)
        • X-ray Crystallography
        • Small-angle X-ray Scattering (SAXS)
        • Wide-angle X-ray Diffraction (WAXD)
        • Grazing-incidence X-ray Scattering (GIXS)
      • Fees : Non-proprietary (\100,000/day), Proprietary (\1,500,000/day), Request for analysis (\2,000,000/day)
    • UCRL use guide

      • Once you get beamtime assignment notification from the user office of Pohang Accelerator laboratory, register for site access through PAL website (http://pal.postech.ac.kr)
      • Complete required radiation safety training through PAL website (http://pal.postech.ac.kr) or make a schedule for onsite radiation safety training.
      • Discuss details of your experiments with beamline contact person in advance and prepare thoroughly for your experiments.
      • Guest house: Register and get the approval for guest house thorough PAL website (http://pal.postech.ac.kr) when you get beamtime assignment. You can pick up keys at user office. When the user office is over, keys can be picked up at the front gate of PAL.
      • Do on-site check-in at user office and perform experiment at the assigned beamline after complete beamline-specific training.
      • Acknowledgments
        • UNIST beamtime: Experiments at PLS were supported in part by MSIP and UNIST Central Research Facilities.
        • General user beamtime: Experiments at PLS were supported in part by MSIP and POSTECH.